Cases

Comprehensive solution for coating industry

Project Overview

The client of this project is one of the top three coating enterprises in the world, producing and operating coatings, glass, glass fiber and chemicals. At present, we help customers from industry, transportation, consumer goods, construction and other fields and their aftermarket to improve the appearance of products in various forms.

In the process of coating production, volatile organic waste gas is produced, which affects the workshop and the environment. In order to protect the environment and meet the national and local emission standards, the customer added 5 sets of waste gas treatment equipment needs, Aier with a large number of core technologies and application cases in the field of waste gas treatment, the customer recognition, this project new equipment by Aier design, manufacturing, installation, commissioning and training services.

The Solution

 

RTO furnace (three chambers) : The process of filter + runner +RTO is adopted. After filtering, the waste gas enters the runner for concentration, and the concentrated waste gas enters the RTO for incineration. The RTO furnace is three-tower, with one inlet, one outlet and one purge.

Dust removal: The explosion-proof cartridge filter is adopted. After dust removal, the particulate matter is controlled below 0.5um, and then the exhaust gas is absorbed into the activated carbon box for adsorption treatment. The VOC concentration at the export reaches the emission standard.

Two activated carbon: exhaust gas into the activated carbon box, organic matter is adsorbed by activated carbon in its interior, clean gas discharge.

Aier waste gas treatment equipment has experienced many years of market verification, service more than 100 waste gas treatment projects. Provide exhaust gas solutions according to specific projects, save energy consumption and reduce operating costs under the premise of ensuring exhaust emission standards.

Project Presentation

 

1. Waste gas treatment project of process workshop

Exhaust gas source: Exhaust gas from the workshop production section.

Characteristics of exhaust gas: large air volume, low concentration, paint fog, more complex composition.

Process: RTO+ wheel + filter

Equipment: RTO furnace (three chambers), zeolite runner, multistage filter, fan, exhaust cylinder, etc

Treated air volume: 100,000 Nm3/h

Exhaust gas composition: non-methane total hydrocarbon

Purification efficiency: ≥98%

2. Waste gas treatment project of warehouse workshop

Source of exhaust gas: material overflow in the warehouse workshop;

Exhaust gas features: the warehouse is equipped with ventilation, low exhaust gas concentration, in order to prevent the accumulation of exhaust gas, concentration rise, exhaust gas treatment facilities.

Process: two stage activated carbon adsorption

Equipment: activated carbon adsorption box, exhaust gas fan, exhaust cylinder, etc

Treated air volume: 45,000 Nm3/h

Exhaust gas composition: non-methane total hydrocarbon

Purification efficiency: ≥90%

3. Waste gas treatment project of packaging workshop

Source of waste gas: waste gas from packaging coating production workshop

Exhaust gas features: the exhaust gas contains a large amount of dust, and there are VOC exhaust gas overflow

Process: Dust removal + two-stage activated carbon system (double explosion-proof)

Equipment: activated carbon adsorption box, induced draft fan, dust collector, chimney, etc

Treated air volume: 30,000 Nm3/h

Exhaust gas composition: non-methane total hydrocarbon

Purification efficiency: ≥98%

4. Waste gas treatment project of industrial production workshop

Source of waste gas: waste gas from packaging coating production workshop

Exhaust gas features: the exhaust gas contains a large amount of dust, and there are VOC exhaust gas overflow

Process: Dust removal + two-stage activated carbon system (double explosion-proof)

Equipment: activated carbon adsorption box, induced draft fan, dust collector, chimney, etc

Treated air volume: 30,000 Nm3/h

Exhaust gas composition: non-methane total hydrocarbon

Purification efficiency: ≥98%

5. Workshop waste gas treatment project

Exhaust gas source: sterilization room, drying room, experimental operation area exhaust gas overflow,

Exhaust gas characteristics: indoor ventilation, low exhaust gas concentration, in order to prevent the accumulation of exhaust gas, concentration, exhaust gas treatment facilities.

Process: two stage activated carbon adsorption

Equipment: activated carbon adsorption box, exhaust gas fan, exhaust cylinder, etc

Treated air volume: 30,000 Nm3/h

Exhaust gas composition: non-methane total hydrocarbon

Purification efficiency: ≥90%

Condition of acceptance

 

The five sets of equipment in this project have been accepted and completed and run stably up to standard. The exhaust gas emission concentration meets the secondary standard in Table 2 of the Comprehensive Emission Standard for Atmospheric Pollutants (GB16297-1996), and the standards in Table 1 and Table 2 of the Emission Standard for Volatile Organic Compounds of the Chemical Industry (DB32/3151-2016). Meet GB37824-2019 “Paint, ink and adhesive industry air pollutant emission standards”.